The spring came to our railyard. We have several "to do's" from the last year, so it is the right time to do them. |

Coal-handling plant |
Final arrangement of the coal-handling plant and the appropriate track. |

Base wall
|
A new concrete base wall under the fence that is around the plant. |

Plant area |
Still unfinished plant area. |

Plant |
A view of the almost finished plant area. Foundation plates for the buildings finally placed and leveled, finally placed the siding through the gate. |

Plant |
A overall view of an eastern corner of the railyard. Plant area and depot.. |

Plant |
A backside view of plant area. The area already finished, including a newly planted small tree. |

Lime-tree |
We planted a real tree into the plant area. We operate a railyard with live steam, so that we have to have a live tree :-)) |

Finished bridge frame |
A frame for the new long concrete bridge was finished, slots between segments were filled by a foam and the whole construction was painted by a special painting for concrete. A track was temporarily laid on top of the construction, without ballast at this time. |

Temporary bridge
|
In order to be able to close the new ring, the future last segment of the bridge was temporarily substituted by a wooden board. |

New siding
|
A sight to the new switch siding to he new bridge. |

A view from the station
|
A view of a part of the new track from the opposite side - from the station. |
 A small church |
We have a new nice little church. |
 On the new bridge |
Our small loco on the new bridge. |